Items that have happened in the last week (that I can see - I'm sure there are many more!)
-Windows are all in place
-Garage Door is on
-Roof is complete including shingles
-Ceiling Fan rough-in's are in place
-Electrical (phone, cable, outlets) wiring
-Bathtubs are in!
-Plumbing is in place
We noticed today when we were walking around that three out of four of our ceiling fan rough-in's were being held up by an extra 2x4. When our superintendent Dave arrived while we were there we asked him about it and he said it would be no problem to put an extra one up in the fourth bedroom. Whether it was needed or not, he said that was no problem.
We have seen Dave at our site the past several times we have driven by and he is always very patient with our questions and willing to walk around and show us things. We greatly appreciate this! Fischer has been extremely easy to work with.
Here are pictures from today
Shingles |
Kids bathroom |
Sunroom |
Family room and fireplace |
Dining room |
Master bathroom |
Steps to 2nd floor |
Kitchen |
House plans |
No comments:
Post a Comment